Lod is building an Ashes Solo Day singel canoe

Thursday, 8 February 2018

Modifying router table

Have spent the week with rebuilding my cheap universal router table. Have replaced everything on top of the table. The plastic featherboards is now replaced  by spring loaded rollers to guide the strips to sit exactly against the router bit.

Spring loaded rollers to keep strip in place

Also a guide to stear the strip when inserted
Posted by lod at 23:18
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Post Older Post Home

Links

  • Nice canoe setting pole shoes from Bruce Hooke
  • Carbon fiber ferrules from Duckworks. Both standard and for greenland paddle or canoe pole
  • Ashes Stillwater Boats
  • Cederträ i Väst
  • Carbix epoxy och glasfiber
  • Titebond 3 lim Plano Maskin

My other blog

  • Lods Singoalla (In english via Google translate)
  • Lods Singoalla (In swedish)

About Me

My photo
lod
View my complete profile

Blog Archive

  • ►  2019 (1)
    • ►  February (1)
  • ▼  2018 (44)
    • ►  July (5)
    • ►  June (8)
    • ►  May (7)
    • ►  April (4)
    • ►  March (9)
    • ▼  February (5)
      • Continueing strip grinding and more
      • Grinding of strips started.
      • Modifying router table
      • Preparing for routing the strips
      • All strips sawn
    • ►  January (6)
Simple theme. Powered by Blogger.