Lod is building an Ashes Solo Day singel canoe

Saturday, 3 March 2018

All strips ready and all forms i place on the strongback.

Finally the arctic cold went away, and the temperature allowed us to finally grind the last stripes.
Also mounted and aligned all forms to the strongback. Next step is to start glueing strips on the hull :)

Forms mounted on strongback
Posted by lod at 16:07
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Post Older Post Home

Links

  • Nice canoe setting pole shoes from Bruce Hooke
  • Carbon fiber ferrules from Duckworks. Both standard and for greenland paddle or canoe pole
  • Ashes Stillwater Boats
  • Cederträ i Väst
  • Carbix epoxy och glasfiber
  • Titebond 3 lim Plano Maskin

My other blog

  • Lods Singoalla (In english via Google translate)
  • Lods Singoalla (In swedish)

About Me

My photo
lod
View my complete profile

Blog Archive

  • ►  2019 (1)
    • ►  February (1)
  • ▼  2018 (44)
    • ►  July (5)
    • ►  June (8)
    • ►  May (7)
    • ►  April (4)
    • ▼  March (9)
      • After weekend update
      • Another weekend in the canoe workshop.
      • Another evening in the workshop
      • Some adjustments
      • Another day with strips.
      • Glueing strips continued and some new tools
      • First strips in place
      • Build of the hull started
      • All strips ready and all forms i place on the stro...
    • ►  February (5)
    • ►  January (6)
Simple theme. Powered by Blogger.