Lod is building an Ashes Solo Day singel canoe

Monday, 21 May 2018

Redesigning strongback

The strongback undercarriage was a little to high for comfortable work, so I decided to make it adjustable in height.

Posted by lod at 13:14
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Post Older Post Home

Links

  • Nice canoe setting pole shoes from Bruce Hooke
  • Carbon fiber ferrules from Duckworks. Both standard and for greenland paddle or canoe pole
  • Ashes Stillwater Boats
  • Cederträ i Väst
  • Carbix epoxy och glasfiber
  • Titebond 3 lim Plano Maskin

My other blog

  • Lods Singoalla (In english via Google translate)
  • Lods Singoalla (In swedish)

About Me

My photo
lod
View my complete profile

Blog Archive

  • ►  2019 (1)
    • ►  February (1)
  • ▼  2018 (44)
    • ►  July (5)
    • ►  June (8)
    • ▼  May (7)
      • Inside laminated
      • Laminating the stems
      • Precoat applied
      • Redesigning strongback
      • Shaving and Grinding inside
      • Outside grinded
      • Outside laminated
    • ►  April (4)
    • ►  March (9)
    • ►  February (5)
    • ►  January (6)
Simple theme. Powered by Blogger.